Marlon Sled Deck Installation

Install the moveable ladder to the driver s side of deck using the spring pin.
Marlon sled deck installation. The 4 inch goes in the centre hole and the 2 2 inch go in the outside holes. Remember to install the spring pin when using the movable ladder this is imperative to the strength of the mounting positions 6. Thread the bolt through the deck leg plywood and truck box. Cantilever design makes one handed lifting easy.
There are 2 lengths 1 4 inch and 2 2 inch. Heavy duty casters with sealed bearings. Load indicator for consistent parking. Install a 1 2 zinc flat washer the smaller flat washer onto a 1 2 x 2 1 2 zinc plated grade 8 bolt.
Repeat steps 5 8 on other 3 deck legs. Easy one person operation. Place it in front of the marlon side decal this is so you can get out of the vehicle once you park. Single loader deck carries one sled or atv.
The 2 front superclamps that get included with the sale of every sled deck come in a brown box marked no deck hook every deck requires 3 superclamp deck hooks to be installed. Installation of superclamp deck hooks note. Marlon xplore pro truck deck install duration. Universal fit 48 x 120 fits all 1 2 ton up to 1 ton trucks.
2 rows of. Same solid infrastructure that we have built our decks on for over 15 years with a new side extrusion. 8 xplore truck deck pro models come with all the features aluminum decking superglides superglide extrusions mounted on the deck for loading on the sides or down the middle and two rear superclamps. Snowtrax tv 14 873 views.